Removal of existing sand filled carpet and replacement with new shockpad and Desso Pro2 40.
Works included the following: removal of existing sand filled surface and roll out pad, re forming edge detail, slurry seal existing paths, supply and lay in-situ rubber shockpad and finish with Desso Pro2 40 3g system.
Another project finished within a very tight timeframe and on budget.